Monthly Archives: May 2013
Pictures of the radiant heat tubing and the front of the house backfill
Drove by and
The plumbers were putting in the radiant heat plumbing and the excavator was backfilling. The lot was full of work.
Concrete forms are off.
More Concrete
Back in Maine so..
Finished the digging, Concrete Friday (probably)
First, the left front corner looking towards the back of the house (garage side). Water line is sheathed and in the middle of the house.
A diagonal/crossview to the back left corner (master bedroom) from the front right corner (guest bedroom) The garage pad and the house pad will have a frost wall between them.
Garage pad. Looking from right front bedroom to the left.
This is the back. (looking from the right (kitchen side) towards the master bedroom. The pad for the sunroom is jutting out.
This is looking along the right hand side along the master bedroom toward the garage. Notice the two white lines showing the walls.